ASHRAE South African Chapter will host a practical course on the application of the National Building Regulation SANS 10400: 2020: Part T. (session 9 of 17). Note these sessions will be hosted in the Zoom platform and access to the link is gained by logging in to Quicket. You will thus need an account with Quicket.
The remaining dates will be confirmed at a later stage.
The costs are per seminar, not for all 17 seminars.
0.1CPD points will be issued for all attendees.
You are welcome to invite other parties to join
ECSA Registered Fire Engineer Mr. Dave Knight (8670208) from Albrecht Knight and Associates offering more than 50 years’ experience will be presenting all 17 courses assisted by relevant industry experts.
The course will be streamed via Zoom. To get your zoom link log in to Quicket.
Please install the software prior to the event. (link to software download page: https://zoom.us/download)
Each month over the course of 60-minutes and 17 months will cover small grouped clauses which will be thoroughly worked through and discussed.
Course content will cover:
– The practical application of the code with worked examples,
– Associated relevant codes,
– Common misconceptions,
– Regular misinterpreted clauses within the codes,
– Classification of buildings and the impact to the codes and design.
Costs will be R270.00 for ASHRAE Members and R330.00 for non-ASHRAE members per session.
Limited Seats are available.
For any queries contact:
Declan van Greunen
Tel: +27 12 663 3125 or
+27 83 291 6578
Email: cttc@ashraesa.org
Deon Nadasen
Tel: +27 31 5632318 or
+27 78 425 8892
Email: deon@hfw.za.com
Course Content:
1 |
Introduction: In the Beginning – Identify the Building”
Part A & Part T: 4.1 & 4.2 Safety Distances / 4.58 – Guest House /B&B
4.59 – Health Care Facilities. |
2 |
4.3 – Different Occupancies / 4.4 – Division Area /
4.5 – Fire Performance / 4.6 – Fire Resistance / 4.7 – Fire Stability |
3 |
4.8 – Tenancy Separating Elements / 4.9 – Partition Walls |
4 |
4.10 – Protection of Openings / 4.11 – Raised Floors /
4.12 – Roof Assemblies and Thatch. |
5 |
Review of new 2020 revision of the Part T code |
6 |
4.13 – Ceilings / 4.14 Floor Coverings / 4.15 Internal Finishes |
7 |
4.16 – Escape Routes / 4.17 – Exit, Escape and Access Doors /
4.18 – Feeder Routes / 4.19 – Emergency / 4.20 – Dimensions /
4.21 – Widths |
8 |
4.22 – Basements / 4.50 – Parking Garages |
9 |
4.23 – Stairways, / Part S & M / 4.24 – Vent of Stairs In Escape Route
4.25 – Pressurization. |
10 |
4.26 – Openings in Floors / 4.27 – External Stairs and Passages. /
4.28 – Lobbies, Foyers, Vestibules. |
11 |
4.29 – Marking & Sign Posting / 4.30 – Emergency Lighting. |
12 |
4.31 – Fire Detection & Alarm. |
13 |
4.32 / 4.33 / 4.34 / 4.35 / 4.37 To 4.41 / Part W / Fire Appliances. |
14 |
4.36 – Automatic Sprinkler Installation. (A N Other) |
15 |
4.42 – Smoke Control (Ron Burns Ashrae Fire Committee Chair) |
16 |
4.43 – Air Conditioning & Ventilation / 4.44 To 4.47– Lifts. |
17 |
4.48 To 4.57 – Stage Seating, Op. Theatre, Tanks, Fire Brigade Access, Building Components. |
|